Orchestration
[!NOTE] Duty Type: OS-Level Kernel Duty
SOT Reference: README v1.0.0 Section 8
Intent
To manage the flow of execution, enforcing dependencies, concurrency limits, and stage transitions within the agent lifecycle.
Lifecycle Coverage
- Execution: Scheduling steps and managing the pipeline.
Agent Scope (SA / MAP)
- SA: Linear step execution.
- MAP: Complex DAG execution with parallel branches.
Required Events
PipelineStageStartedPipelineStageCompletedWorkflowPaused
Compliance Requirements
- Runtime MUST respect dependency graphs (Step B cannot start until Step A completes).
- Runtime MUST emit
PipelineStageEventfor every state transition. - Runtime MUST support pausing and resuming workflows.
Implementation Details (Non-Normative)
Orchestration is primarily handled by the Plan Module. The Plan object serves as the executable blueprint for the agent's actions.
Plan Structure
The Plan object (mplp-plan.schema.json) decomposes a high-level objective into atomic units of work:
steps: An array ofPlanStepobjects, each representing a discrete task.dependencies: Within each step, a list ofstep_ids that must complete before execution can proceed. This explicitly defines the Directed Acyclic Graph (DAG) of execution.status: Tracks the lifecycle of the plan (draft->proposed->approved->in_progress->completed).
Step Execution
Each step includes:
agent_role: The specific role responsible for executing the step.status: Granular tracking of step progress (pending,in_progress,blocked,completed).
Schema Reference
| Schema | Purpose | Key Fields |
|---|---|---|
mplp-plan.schema.json | Defines the execution plan | plan_id, steps, status, objective |
plan_step_core ($defs) | Defines a single step | step_id, dependencies, agent_role, status |
Examples
- DAG Execution: Running 3 research agents in parallel, then aggregating their results in a final summary step.
- Approval Gate: Pausing execution until a human confirms the plan.